How can I change the order of the tabs, which are displayed in the Add Item window?E.g.: I want Extra Fields on the first place. Already tried to mess with ./views/item/tmpl/form.php around line 351 and shuffle the <li> tags. Doing that I was able to change to tab order, but the content under the tabs did not relocate, so it was a mess.Any thoughts?
16 years 8 months ago #79640